Jun 24, 2021

KDOT announces 11 highway projects in northwest Kan.

Posted Jun 24, 2021 10:28 AM

KDOT

The Kansas Department of Transportation has announced approved bids for state highway construction and maintenance projects. The letting took place June 16 in Topeka. Some of the bids may include multiple projects that have been bundled based on proximity and type of work.

District One — Northeast

Johnson ‑ 69‑46 KA‑5792‑01 ‑ U.S. 69 (southbound), from 720 feet south of W. 52nd Street, guard fence, 0.1 mile, Cooper Construction LLC, Emporia, Kansas, $31,477.35.

Riley ‑ 18‑81 KA‑6160‑01 ‑ K‑18, from approximately the Geary/Riley county line east to the K‑18/K‑113 junction, pavement marking, 8.5 miles, Cillessen and Sons Inc., Kechi, Kansas, $801,831.69.

Wyandotte ‑ 635‑105 KA‑5627‑01 ‑ I‑635, bridges #183 and #184 located at the east I‑635/K‑5 interchange, bridge deck, 0.2 mile, Miles Excavating, Inc., Basehor, Kansas, $5,237,806.66.

Wyandotte ‑ 635‑105 KA‑5923‑01 ‑ I‑635, bridge #044 located 1,320 feet south of I‑70, bridge repair, PCI Roads, LLC, Saint Michael, Minnesota, $113,755.20.

District Two — North Central

Saline ‑ 135‑85 KA‑5680‑01 ‑ I‑135, bridge #028 over Union Pacific Railroad and stream located 3.23 miles north of Magnolia Street; bridge #033 over Dry Creek Drainage located 0.40 mile north of K‑140; bridge #037 over Mulberry Creek located 1.02 miles north of K‑140; and bridge #035 over the Kansas and Oklahoma Railroad located 0.74 mile north of K‑140, bridge repair, APAC-Kansas Inc. Shears Division, Hutchinson, Kansas, $1,156,648.05.

Saline ‑ 135‑85 KA‑6064‑01 ‑ I‑135, from the McPherson/Saline county line north to the I‑135/I‑70 junction, overlay, 18.8 miles, APAC-Kansas Inc. Shears Division, Hutchinson, Kansas, $17,876,754.38.

District Three — Northwest

Ellis ‑ 70‑26 KA‑6011‑01 ‑ I‑70/U.S. 40/ U.S. 183 Bypass (North Campus Drive) interchange, lighting, IES Holding Inc & Subsidiaries, Holdrege, Nebraska, $188,953.00.

Gove ‑ 70‑32 KA‑6012‑01 ‑ I‑70/ U.S. 40 interchange near Oakley, lighting, IES Holding Inc & Subsidiaries, Holdrege, Nebraska, $143,845.00.

Phillips ‑ 383‑74 KA‑2372‑03 ‑ K‑383, from the north edge of the wearing surface of bridge #051 over Prairie Dog Creek northeast to the K‑383/U.S. 183 junction, grading and surfacing, 5.8 miles, Venture Corporation, Great Bend, Kansas, $11,834,952.68.

Sherman ‑ 70‑91 KA‑6013‑01 ‑ I‑70/U.S. 24B (Exit 19) interchange in Goodland, lighting, lighting, IES Holding Inc & Subsidiaries, Holdrege, Nebraska, $155,453.00.

Statewide ‑ 106 KA‑6161‑01 ‑ Various locations in District 3 in Logan, Thomas, Decatur, Gove, Graham and Smith counties, milling, Venture Corporation, Great Bend, Kansas, $13,340.00.

Trego ‑ 70‑98 KA‑6014‑01 ‑ I‑70/K‑147 interchange near Ogallah, lighting, IES Holding Inc & Subsidiaries, Holdrege, Nebraska, $151,767.00.

District Five — South Central

Butler ‑ 54‑8 KA‑5799‑01 ‑ U.S. 54, at six locations beginning 2,750 feet east of S.E. Gray Road, east to 1,350 feet west of the Butler/Greenwood county line, guard fence, 3.7 miles, Bettis Asphalt & Construction Inc., Topeka, Kansas, $722,014.84.

Harvey ‑ 50‑40 KA‑5797‑01 ‑ U.S. 50, at the Old Trail Road/U.S. 50 eastbound on ramp located 2,370 feet northeast of Spencer Road, guard fence, 0.1 mile, Cooper Construction LLC, Emporia, Kansas, $36,932.83.

The following bids were approved from the May 19, 2021, bid letting.

Comanche ‑ 17 C‑4985‑01 ‑ Various minor collector routes, signing, 53.0 miles, Signs Up LTD DBA Haren's Trees and Critters, Webster City, Iowa, $115,026.92.

Reno ‑ 78 C‑4977‑01 ‑ Major and minor collector roads east of K‑14, signing, 238.0 miles, CC & I Engineering Inc./DBA Compass Consultants, Perham, Minnesota, $365,245.68

Riley ‑ 81 C‑4989‑01 – Bridge over Swede Creek located 4.2 miles east and 7.0 miles north of Randolph, bridge replacement, 0.3 mile, Ebert Construction Co Inc & Subsidiary, Wamego, Kansas, $385,903.23.